Tips To Solve CAT Time And Work

- Fundamentals of this concept are useful in solving the questions of the other topics by assuming the unknown values as variables. Make sure to cover other inter-related concepts of CAT syllabus. All the inter-related concepts need to be covered to have a good foundation in concepts.

- Be careful of silly mistakes in this topic, as that is how students generally lose marks here. The number of equations needed to solve the given problem equals the number of variables. A linear equation is an equation which gives a straight line when plotted on a graph.

- If you are confused, enrolling in CAT online coaching will help you a long way.

- Linear equations can be of one variable or two variables, or three variables.

  • Let a, b, c and d be constants, and x, y, and z are variables. A general form of a single variable linear equation is ax + b = 0.
  • A general form of two-variable linear equation is ax + by = c.
  • A general form of three-variable linear equation is ax + by + cz = d.

CAT Time And Work PDF

To help CAT aspirants in their preparation, we have made a comprehensive formula PDF containing all the important linear equations that are essential. This PDF includes all the necessary formulas, techniques, and examples required to solve linear equations efficiently. Click on the link below to download the Linear equations formula PDF.

1. Linear Equations Formulae: Solving Linear Equations

For equations of the form ax + by = c and mx + ny = p, find the LCM of b and n.

Multiply each equation with a constant to make the y term coefficient equal to the LCM. Then subtract equation 2 from equation 1.

2. Linear Equations Formulae: Straight Lines

Equations with 2 variables: Consider two equations ax + by = c and mx + ny = p. Each of these equations represents two lines on the x-y coordinate plane. The solution of these equations is the point of intersection.

If am=bncp: This means that both the equations have the same slope but different intercepts, and hence are parallel to each other. There is no point of intersection and no solution.

If ambn: They have different slopes and hence must intersect at some point, resulting in a unique solution.

If am=bn=cp: The two lines have the same slope and intercept. Hence, they are the same lines. As they have infinite points common between them, there are infinitely many solutions possible.

Question 1.

Coachify Logo

At their usual efficiency levels, A and B together finish a task in 12 days. If A had worked half as efficiently as she usually does, and B had worked thrice as efficiently as he usually does, the task would have been completed in 9 days. How many days would A take to finish the task if she works alone at her usual efficiency?

A
36
B
24
C
12
D
18

Question 2.

Coachify Logo

Three machines, A, B and C can be used to produce a product. Machine A will take 60 hours to produce a million units. Machine B is twice as fast as Machine A. Machine C will take the same amount of time to produce a million units as A and B running together. How much time will be required to produce a million units if all the three machines are used simultaneously? (in hous)

A
12
B
10
C
8
D
6

Question 3.

Coachify Logo

Three small pumps and one large pump are filling a tank. Each of the three small pumps works at 2/3rd the rate of the large pump. If all 4 pumps work at the same time, then they should fill the tank in what fraction of time that it would have taken the large pump alone?

A
47\frac{4}{7}
B
13\frac{1}{3}
C
23\frac{2}{3}
D
34\frac{3}{4}

Question 4.

Coachify Logo

Alord got an order from a garment manufacturer for 480 Denim Shirts. He brought 12 sewing machines and appointed some expert tailors to do the job. However, many didn’t report to duty. As a result, each of those who did, had to stitch 32 more shirts than originally planned by Alord, with equal distribution of work. How many tailors had been appointed earlier and how many had not reported for work?

A
12, 4
B
10, 3
C
10, 4
D
None of these

Question 5.

Coachify Logo

It takes 6 technicians a total of 10 hours to build a new server from Direct Computer, with each working at the same rate. If six technicians start to build the server at 11 a.m. and one technician per hour is added beginning at 5 p.m., at what time will the server be complete?

A
6:40 p.m.
B
7:00 p.m.
C
7:20 p.m.
D
8:00 p.m.

Question 6.

Coachify Logo

A contractor agreed to construct a 6 km road in 200 days. He employed 140 persons for the work. After 60 days, he realized that only 1.5 km road has been completed. How many additional people would he need to employ in order to finish the work exactly on time?

A
B
C
D

Question 7.

Coachify Logo

A group of workers was put on a job. From the second day onwards, one worker was withdrawn each day. The job was finished when the last worker was withdrawn. Had no worker been withdrawn at any stage, the group would have finished the job in two-third the time. How many workers were there in the group?

A
2
B
3
C
5
D
11

Question 8.

Coachify Logo

John takes twice as much time as Jack to finish a job. Jack and Jim together take one-thirds of the time to finish the job than John takes working alone. Moreover, in order to finish the job, John takes three days more than that taken by three of them working together. In how many days will Jim finish the job working alone?

A
B
C
D

Question 9.

Coachify Logo

In Nuts And Bolts factory, one machine produces only nuts at the rate of 100 nuts per minute and needs to be cleaned for 5 minutes after production of every 1000 nuts. Another machine produces only bolts at the rate of 75 bolts per minute and needs to be cleaned for 10 minutes after production of every 1500 bolts. If both the machines start production at the same time, what is the minimum duration required for producing 9000 pairs of nuts and bolts?

A
130 minutes
B
135 minutes
C
170 minutes
D
180 minutes

Question 10.

Coachify Logo

A chemical plant has four tanks (A, B, C, and D), each containing 1000 litres of a chemical. The chemical is being pumped from one tank to another as follows:

From A to B @ 20 litres/minute

From C to A @ 90 litres/minute

From A to D @ 10 litres/minute

From C to D @ 50 litres/minute

From B to C @ 100 litres/minute

From D to B @ 110 litres/minute

Which tank gets emptied first and how long does it take (in minutes) to get empty after pumping starts?

A
A, 16.66
B
C, 20
C
D, 20
D
D, 25

Question 11.

Coachify Logo

Anil can paint a house in 12 days while Barun can paint it in 16 days. Anil, Barun, and Chandu undertake to paint the house for ₹ 24000 and the three of them together complete the painting in 6 days. If Chandu is paid in proportion to the work done by him, then the amount in INR received by him is

A
B
C
D

Question 12.

Coachify Logo

There is a leak in the bottom of the tank. This leak can empty a full tank in 8 hours. When the tank is full, a tap is opened into the tank which admits 6 litres per hour and the tank is now emptied in 12 hours. What is the capacity of the tank?

A
28.8 litres
B
36 litres
C
144 litres
D
Cannot be determined

Question 13.

Coachify Logo

Amal can complete a job in 10 days and Bimal can complete it in 8 days. Amal, Bimal and Kamal together complete the job in 4 days and are paid a total amount of Rs 1000 as remuneration. If this amount is shared by them in proportion to their work, then Kamal’s share, in rupees, is

A
100
B
200
C
300
D
400

Question 14.

Coachify Logo

One day, Rahul started a work at 9 AM and Gautam joined him two hours later. They then worked together and completed the work at 5 PM the same day. If both had started at 9 AM and worked together, the work would have been completed 30 minutes earlier. Working alone, the time Rahul would have taken, in hours, to complete the work is:

A
10
B
12
C
12.5
D
11.5

Question 15.

Coachify Logo

One man can do as much work in one day as a woman can do in 2 days. A child does one third the work in a day as a woman. If an estate-owner hires 39 pairs of hands, men, women and children in the ratio 6 : 5 : 2 and pays them in all Rs. 1113 at the end of the days work. What must the daily wages of a child be, if the wages are proportional to the amount of work done?

A
Rs. 14
B
Rs. 5
C
Rs. 20
D
Rs. 7

Question 16.

Coachify Logo

A tank has an inlet pipe and an outlet pipe. If the outlet pipe is closed then the inlet pipe fills the empty tank in 8 hours. If the outlet pipe is open then the inlet pipe fills the empty tank in 10 hours. If only the outlet pipe is open then in how many hours the full tank becomes half-full?

A
20
B
30
C
40
D
45

Question 17.

Coachify Logo

Two pipes A and B are attached to an empty water tank. Pipe A fills the tank while pipe B drains it. If pipe A is opened at 2 pm and pipe B is opened at 3 pm, then the tank becomes full at 10 pm. Instead, if pipe A is opened at 2 pm and pipe B is opened at 4 pm, then the tank becomes full at 6 pm. If pipe B is not opened at all, then the time, in minutes, taken to fill the tank is:

A
140
B
120
C
144
D
264

Question 18.

Coachify Logo

Two typists undertake to do a job. The second typist begins working one hour after the first. Three hours after the first typist has begun working, there is still 920\frac{9}{20} of the work to be done. When the assignment is completed, it turns out that each typist has done half the work. How many hours would it take each one to do the whole job individually ?

A
12 hr and 8 hr
B
8 hr and 5.6 hr
C
10 hr and 8 hr
D
5 hr and 4 hr

Question 19.

Coachify Logo

A person can complete a job in 120 days. He works alone on Day 1. On Day 2, he is joined by another person who also can complete the job in exactly 120 days. On Day 3, they are joined by another person of equal efficiency. Like this, everyday a new person with the same efficiency joins the work. How many days are required to complete the job?

A
B
C
D

Question 20.

Coachify Logo

Anil can paint a house in 60 days while Bimal can paint it in 84 days. Anil starts painting and after 10 days, Bimal and Charu join him. Together, they complete the painting in 14 more days. If they are paid a total of ₹ 21000 for the job, then the share of Charu, in INR, proportionate to the work done by him, is

A
9100
B
9000
C
9150
D
9200

Question 21.

Coachify Logo

A group of men decided to do a job in 8 days. But since 10 men dropped out every day, the job got completed at the end of the 12th day. How many men were there at the beginning?

A
165
B
175
C
80
D
90

Question 22.

Coachify Logo

A tank is emptied everyday at a fixed time point. Immediately thereafter, either pump A or pump B or both start working until the tank is full. On Monday, A alone completed filling the tank at 8 pm. On Tuesday, B alone completed filling the tank at 6 pm. On Wednesday, A alone worked till 5 pm, and then B worked alone from 5 pm to 7 pm, to fill the tank. At what time was the tank filled on Thursday if both pumps were used simultaneously all along?

A
4:36 pm
B
4:12 pm
C
4:48 pm
D
4:24 pm

Question 23.

Coachify Logo

The Weirdo Holiday Resort follows a particular system of holidays for its employees. People are given holidays on the days where the first letter of the day of the week is the same as the first letter of their names. All employees work at the same rate.

Starting on February 25, 1996, if Raja had finished his job on April 2, 1996, when would T and S together likely to have completed the job, had they started on the same day as Raja?

A
March 15, 1996
B
March 14, 1996
C
March 22, 1996
D
Data insufficient

Question 24.

Coachify Logo

Amar, Akbar and Anthony are working on a project. Working together Amar and Akbar can complete the project in 1 year, Akbar and Anthony can complete in 16 months, Anthony and Amar can complete in 2 years. If the person who is neither the fastest nor the slowest works alone, the time in months he will take to complete the project is

A
B
C
D

Question 25.

Coachify Logo

Anu, Vinu and Manu can complete a work alone in 15 days, 12 days and 20 days, respectively. Vinu works everyday. Anu works only on alternate days starting from the first day while Manu works only on alternate days starting from the second day. Then, the number of days needed to complete the work is

A
8
B
6
C
5
D
7

Question 26.

Coachify Logo

Ramesh and Ganesh can together complete a work in 16 days. After seven days of working together, Ramesh got sick and his efficiency fell by 30%. As a result, they completed the work in 17 days instead of 16 days. If Ganesh had worked alone after Ramesh got sick, in how many days would he have completed the remaining work?

A
12
B
11
C
13.5
D
14.5

Question 27.

Coachify Logo

The Weirdo Holiday Resort follows a particular system of holidays for its employees. People are given holidays on the days where the first letter of the day of the week is the same as the first letter of their names. All employees work at the same rate.

Raja starts working on February 25, 1996, and finishes the job on March 2, 1996. How much time would T and J take to finish the same job if both start on the same day as Raja?

A
4 days
B
5 days
C
Either (a) or (b)
D
Cannot be determined

Question 28.

Coachify Logo

Bob can finish a job in 40 days, if he works alone. Alex is twice as fast as Bob and thrice as fast as Cole in the same job. Suppose Alex and Bob work together on the first day, Bob and Cole work together on the second day, Cole and Alex work together on the third day, and then, they continue the work by repeating this three-day roster, with Alex and Bob working together on the fourth day, and so on. Then, the total number of days Alex would have worked when the job gets finished, is

A
B
C
D

Question 29.

Coachify Logo

A water tank has inlets of two types A and B. All inlets of type A when open, bring in water at the same rate. All inlets of type B, when open, bring in water at the same rate. The empty tank is completely filled in 30 minutes if 10 inlets of type A and 45 inlets of type B are open, and in 1 hour if 8 inlets of type A and 18 inlets of type B are open. In how many minutes will the empty tank get completely filled if 7 inlets of type A and 27 inlets of type B are open?

A
B
C
D

Question 30.

Coachify Logo

A company has a job to prepare certain number cans and there are three machines A, B and C for this job. A can complete the job in 3 days, B can complete the job in 4 days, and C can complete the job in 6 days. How many days will the company take to complete the job if all the machines are used simultaneously?

A
4 days
B
43\frac{4}{3} days
C
3 days
D
12 days

Question 31.

Coachify Logo

When they work alone, B needs 25% more time to finish a job than A does. They two finish the job in 13 days in the following manner: A works alone till half the job is done, then A and B work together for four days, and finally B works alone to complete the remaining 5% of the job. In how many days can B alone finish the entire job?

A
18
B
22
C
16
D
20

Question 32.

Coachify Logo

A group of N people worked on a project. They finished 35% of the project by working 7 hours a day for 10 days. Thereafter, 10 people left the group and the remaining people finished the rest of the project in 14 days by working 10 hours a day. Then the value of N is

A
23
B
140
C
36
D
150

Question 33.

Coachify Logo

Consider the same sequence of three instructions and the same initial state mentioned above. Three more instructions are added at the end of the above sequence to have A contain 4 litres of water. In this total sequence of six instructions, the fourth one is DRAIN (A). This is the only DRAIN instruction in the entire sequence. At the end of the execution of the above sequence, how much water (in litres) is contained in C?

A
One
B
Two
C
Zero
D
None of these

Question 34.

Coachify Logo

Humans and robots can both perform a job but at different efficiencies. Fifteen humans and five robots working together take thirty days to finish the job, whereas five humans and fifteen robots working together take sixty days to finish it. How many days will fifteen humans working together (without any robot) take to finish it?

A
36
B
32
C
45
D
40

Question 35.

Coachify Logo

Working alone, the times taken by Anu, Tanu and Manu to complete any job are in the ratio 5 : 8 : 10. They accept a job which they can finish in 4 days if they all work together for 8 hours per day. However, Anu and Tanu work together for the first 6 days, working 6 hours 40 minutes per day. Then, the number of hours that Manu will take to complete the remaining job working alone is:

A
B
C
D

Question 36.

Coachify Logo

There are three bottles of water, A, B, C, whose capacities are 5 litres, 3 litres, and 2 litres respectively. For transferring water from one bottle to another and to drain out the bottles, there exists a piping system. The flow thorough these pipes is computer controlled. The computer that controls the flow through these pipes can be fed with three types of instructions, as explained below.

Initially, A is full with water, and B and C are empty.

After executing a sequence of three instructions, bottle A contains one litre of water. The first and the third of these instructions are shown below

First instruction FILL (C, A)

Third instruction FILL (C, A)

Which of the following statements about the instructions is true?

A
The second instruction is FILL (B, A)
B
The second instruction is EMPTY (C, B)
C
The second instruction transfers water from B to C
D
The second instruction involves using the water in bottle A.

Question 37.

Coachify Logo

Choose 1; if the question can be answered by using one of the statements alone, but cannot be answered using the other statement alone.
Choose 2; if the question can be answered by using either statement alone.
Choose 3; if the question can be answered by using both statements together, but cannot be answered using either statement alone.
Choose 4; if the question cannot be answered even by using both statements together.

  1. Transfer rate is 6 Kilobytes per second.
  2. The size of the software is 4.5 megabytes.

What will be the time for downloading software?

A
1
B
2
C
3
D
4

Question 38.

Coachify Logo

A tank is fitted with pipes, some filling it and the rest draining it. All filling pipes fill at the same rate, and all draining pipes drain at the same rate. The empty tank gets completely filled in 6 hours when 6 filling and 5 draining pipes are on, but this time becomes 60 hours when 5 filling and 6 draining pipes are on. In how many hours will the empty tank get completely filled when one draining and two filling pipes are on?

A
B
C
D

Question 39.

Coachify Logo

Gautam and Suhani, working together, can finish a job in 20 days. If Gautam does only 60% of his usual work on a day, Suhani must do 150% of her usual work on that day to exactly make up for it. Then, the number of days required by the faster worker to complete the job working alone is

A
B
C
D

Question 40.

Coachify Logo

There's a lot of work in preparing a birthday dinner. Even after the turkey is in oven, there are still the potatoes and gravy, yams, salad, and cranberries, not to mention setting the table. Three friends, Asit, Arnold, and Afzal, work together to get all of these chores done. The time it takes them to do the work together is six hours less than Asit would have taken working alone, one hour less than Arnold would have taken, and half the time Afzal would have taken working alone.How long did it take them to do these chores working together?

A
20 minutes
B
30 minutes
C
40 minutes
D
50 minutes

Question 41.

Coachify Logo

John gets Rs 57 per hour of regular work and Rs 114 per hour of overtime work. He works altogether 172 hours and his income from overtime hours is 15% of his income from regular hours. Then, for how many hours did he work overtime?

A
B
C
D

Question 42.

Coachify Logo

Rahul, Rakshita and Gurmeet, working together, would have taken more than 7 days to finish a job. On the other hand, Rahul and Gurmeet, working together would have taken less than 15 days to finish the job. However, they all worked together for 6 days, followed by Rakshita, who worked alone for 3 more days to finish the job. If Rakshita had worked alone on the job then the number of days she would have taken to finish the job, cannot be

A
21
B
17
C
16
D
20

Question 43.

Coachify Logo

A can complete a piece of work in 4 days. B takes double the time taken by A, C takes double that of B, and D takes double that of C to complete the same task. They are paired in groups of two each. One pair takes two thirds the time needed by the second pair to complete the work. Which is the first pair?

A
A, B
B
A, C
C
B, C
D
A, D

Question 44.

Coachify Logo

Anil alone can do a job in 20 days while Sunil alone can do it in 40 days. Anil starts the job, and after 3 days, Sunil joins him. Again, after a few more days, Bimal joins them and they together finish the job. If Bimal has done 10% of the job, then in how many days was the job done?

A
13
B
12
C
15
D
14

Question 45.

Coachify Logo

Pipes A and C are fill pipes while Pipe B is a drain pipe of a tank. Pipe B empties the full tank in one hour less than the time taken by Pipe A to fill the empty tank. When pipes A, B and C are turned on together, the empty tank is filled in two hours. If pipes B and C are turned on together when the tank is empty and Pipe B is turned off after one hour, then Pipe C takes another one hour and 15 minutes to fill the remaining tank. If Pipe A can fill the empty tank in less than five hours, then the time taken, in minutes, by Pipe C to fill the empty tank is

A
60
B
90
C
75
D
120

Question 46.

Coachify Logo

A water tank has three taps A, B, and C. A fills four buckets in 24 minutes, B fills 8 buckets in 1 hour and C fills 2 buckets in 20 minutes. If all the taps are opened together a full tank is emptied in 2 hours. If a bucket can hold 5 litres of water, what is the capacity of the tank?

A
120 litres
B
240 litres
C
180 litres
D
60 litres

Question 47.

Coachify Logo

Three men and eight machines can finish a job in half the time taken by three machines and eight men to finish the same job. If two machines can finish the job in 13 days, then how many men can finish the job in 13 days?

A
B
C
D

Question 48.

Coachify Logo

The amount of job that Amal, Sunil and Kamal can individually do in a day, are in harmonic progression. Kamal takes twice as much time as Amal to do the same amount of job. If Amal and Sunil work for 4 days and 9 days, respectively, Kamal needs to work for 16 days to finish the remaining job. Then the number of days Sunil will take to finish the job working alone, is

A
B
C
D

Explore Our Learning Zones

Access a vast collection of previous year questions to sharpen your exam preparation, all for free!

Whatsapp
Logo
CAT Batch Discount?
YoutubeInstagramTelegramWhatsappPhone